Skip to main content
NKBA + KCMA CERTIFIED . HGTC RED SEAL . $5M LIABILITY . 17+ YRS GTA
Standardized condo kitchen installed during a Toronto bulk-unit rollout
Condo . Shop-built in the GTA . Blum standard

Bulk-Unit Cabinet Programs for Toronto Condo Buildings

Boards and developers get one locked per-unit price, a standardized SKU catalog and a phased schedule. On a 24-unit King West rollout we ran four crews in parallel and handed every suite over on time.

Published price

$5,500-$9,500

per unit (20+ suites)

Timeline

Phased

Shop + install

Warranty

15 years

Lifetime on Blum

  • Locked per-unit pricing for 20+ suites
  • Standardized SKU catalog and finish lock
  • Parallel crews and phased suite handover
  • COI in 24 hours, WSIB, $5M liability
Priority 1-2 Day Response

Free Bulk-Unit Cabinets Quote

Tell us about your kitchen. We'll send a CAD layout + itemized quote within 1-2 business days.

Shared only with our Toronto team.

  • NKBA + KCMA certified
  • HGTC Red Seal lead
  • $5M liability + WSIB
  • 2,100+ GTA installs
  • 97% satisfaction
What Is Included

What Is Included in Condo Board Bulk-Unit Cabinets?

Per-unit pricing for 20+ suites, standardized SKU catalog, parallel crews and suite-by-suite handover with COI in hand.

  • Locked per-unit pricing for 20+ suites
  • Standardized SKU catalog and finish lock
  • Parallel crews and phased suite handover
  • COI in 24 hours, WSIB, $5M liability
Cabinet boxes labelled by suite number at a condo loading dock

What Is a Condo Bulk-Unit Cabinet Program?

A bulk-unit program replaces the kitchens, and often the vanities, in many suites of one building under a single contract. Instead of 40 owners each hiring a different contractor, the board or developer agrees one catalog, one per-unit price and one schedule. Owners get a new kitchen; the building gets one set of trades in the elevators and consistent finishes in every suite.

We have run bulk programs in towers around Yorkville, King West, Mimico and Church-Wellesley. The work is the same shop-built cabinetry as our condo kitchen renovations; what changes is the planning, the paperwork and the crew count.

How a Bulk Program Is Structured

The SKU catalog

We survey each suite layout and design a fixed set of boxes and doors that covers them. A two-tower building with three layouts might need 14 SKUs. The catalog is what keeps pricing locked and replacements simple.

The mock-up suite

One suite is built and installed first. The board, management and a few owners see the finish, the fit and the install process before anyone signs off on the rest.

Phasing

Production runs in batches labelled by suite and floor. Crews install in parallel, floor by floor, so each owner loses their kitchen for days rather than weeks.

Owner upgrades

Owners who want white oak fronts or a different finish can pay for an upgrade tier directly. It is built and installed inside the same schedule.

Bulk-Unit Pricing

ScopeUnitPrice range
Galley SKU set (20+ suites)Per unit$5,500-$7,500
L-shape SKU set (20+ suites)Per unit$7,000-$9,500
Matching vanity SKUPer unit$1,800-$2,800
Owner upgrade tierPer unitQuoted per tier

Why lock the price per unit

A per-unit price lets the board budget the whole building, lets owners know their share before the vote, and keeps change orders out of the project.

Common Problems on Building-Wide Jobs

Finishes that drift between phases

Fixed with a finish lock at the start and shop-built doors from one supplier.

Residents fed up with the noise and the elevators

Fixed with booked elevators, daily corridor protection and parallel crews.

Missing paperwork

Fixed with a COI in 24 hours, WSIB clearance and a sign-off sheet per suite.

Replacements years later

Fixed with a standard SKU catalog the property manager package can draw on for repairs and turnovers.

What Boards Should Prepare Before Requesting a Quote

A bulk program moves fastest when the board can share four things: floor plans for each suite type, the number of suites of each type, the building's renovation rules (work hours, elevator bookings, deposits and noise limits), and the decision process for owners who want upgrades. With those in hand, we can survey the building and return a catalog and per-unit price in a few weeks.

It also helps to agree a communication plan. Owners want to know when their kitchen will be out of service and for how long. We provide a floor-by-floor schedule the manager can circulate, and we keep it current.

How We Keep a Building-Wide Job on Schedule

Batch production

Boxes are cut and finished in batches by floor and labelled by suite number before they leave the shop.

Dock and elevator plan

Deliveries are timed to the dock window and staged so crews are never waiting on materials.

Parallel crews

Up to four crews install at once, each with a lead who signs off every suite.

Daily cleanup

Corridors and elevators are protected and cleaned every day, which keeps residents and management on side.

After Handover

Each suite gets a sign-off sheet listing the SKUs installed. That record feeds the building's future repairs and turnovers, and many managers move into our annual property manager package after a bulk rollout.

Questions Boards Ask Before Approving a Program

  • Is the per-unit price locked, and what could change it?
  • How long will each suite be without a kitchen?
  • Who handles owner upgrade payments?
  • What insurance and WSIB documentation will we receive?
  • How are repairs handled after handover?

Bulk Programs Across the GTA

We have run bulk programs in Yorkville, King West, Church-Wellesley and Mimico towers, and work with developers on new builds and conversions across the GTA. Bulk runs are cut on the same CNC line as our one-off custom cabinets in Toronto, so every suite gets the same box and hardware spec.

Published Pricing

What Does a Condo Bulk-Unit Cabinet Program Cost?

All-in ranges with CNC fabrication and install. You get a written tally after laser templating and before any deposit.

Condo Board Bulk-Unit Cabinets pricing in Toronto
ScopePrice RangeTimeline
Galley SKU set, per unit (20+ suites) $5,500-$7,500 Phased
L-shape SKU set, per unit (20+ suites) $7,000-$9,500 Phased
Matching vanity SKU, per unit $1,800-$2,800 With kitchen
Owner upgrade tier (species or finish), per unit Quoted per tier With rollout

Guaranteed Transparency

Written per-linear-foot quote before any deposit. 25/50/25 payment schedule. 5% off for pay-in-full. No consult fee.

Materials

Materials We Use for Bulk-Unit Cabinets

Every material is named on your quote, so you can compare like for like.

Standardized SKU catalog

A fixed set of box sizes, door styles and finishes for the building, so every suite matches and replacements are simple.

Melamine-faced ply boxes

Durable melamine-faced ply for program pricing, or Baltic Birch where the budget allows.

Blum Blumotion hardware

Soft-close Blum hinges and runners on every unit, lifetime-rated.

Finish lock

Door colour and finish are locked at the start so later phases match earlier ones.

Owner upgrade tiers

Optional species or finish upgrades owners can pay for directly, built inside the same schedule.

Documentation

Certificate of insurance within 24 hours, WSIB clearance and suite-by-suite handover sheets.

See the full door style, finish and substrate catalogue

Door Styles

  • Painted MDF Shaker

    Classic GTA favourite

  • Solid wood flat-slab

    Walnut, white oak, maple

  • Raised panel

    Traditional, formal

  • Mitred profile

    Transitional

  • Inset

    Heritage, true-to-period

  • Paint-grade poplar

    Full custom colour

Finishes + Hardware

  • Benjamin Moore Advance + Scuffx paint

    Hard-curing paint for painted doors

  • Rubio Monocoat + Osmo natural oil

    Low-sheen oil for walnut and oak

  • UV-cured conversion varnish

    Chip and moisture resistant topcoat

  • Blum Legrabox + Blumotion hardware

    Standard on every job

  • Richelieu + Top Knobs pulls

    Brass, black, nickel, leather

  • Rev-A-Shelf pull-outs + organizers

    Waste, spice, corner, pantry

Box Substrates

  • Baltic Birch plywood

    Standard boxes; sink bases marine-grade

  • Moisture-resistant HDF

    Bath vanities and laundry rooms

  • Melamine-faced ply

    Budget tier and bulk-unit programs

Open the materials page
Why Toronto Elite

Why Choose Toronto Elite for Bulk-Unit Cabinets?

One locked price

Per-unit pricing fixed before the first suite, with no change-order surprises.

Parallel crews

Up to four crews running at once, so owners lose their kitchens for days, not weeks.

Paperwork ready

COI in 24 hours, WSIB clearance and $5M liability, sent before you ask.

Every suite matches

A standardized SKU catalog and finish lock across phases.

Shop-built in the GTA

Replacements and repairs come from the same shop, not a container months away.

Not sure if you need refacing or new boxes?

A designer can tell from a few photos. You get an honest read and a written range, with no consult fee.

Process

How Does a Bulk-Unit Rollout Work?

CAD, laser, CNC, install. The order never changes, because each step protects the next one.

  1. 01 / Step

    Building survey

    We survey every suite type, the loading dock, elevators and the building's work-hour rules.

  2. 02 / Step

    SKU catalog + pricing

    We design a standard catalog for each layout and lock a per-unit price for the board.

  3. 03 / Step

    Mock-up suite

    One suite is built first so the board and management can sign off finish and fit.

  4. 04 / Step

    Phased production

    Boxes are built in batches and labelled by suite, delivered floor by floor.

  5. 05 / Step

    Parallel installs + handover

    Multiple crews install in parallel, each suite handed over with a sign-off sheet.

Before: original laminate condo kitchen in a Yorkville tower Before
After: standardized SKU kitchen in a Yorkville tower suite After
Before + After Case Study

Yorkville 2-Tower Bulk-Unit Standardized SKU Rollout

Yorkville . Bay St and Yorkville Ave corridor

Two towers under one board, more than 40 suites with three kitchen layouts. We built a 14-SKU catalog, ran a mock-up suite for board sign-off, locked a per-unit price and scheduled crews floor by floor so each owner lost their kitchen for under a week. Owners could upgrade to white oak fronts inside the same schedule.

Materials
Standardized SKU catalog, melamine-faced ply boxes, Blum Blumotion
Size
40+ suites
Turnaround
Phased over 5 months
Project value
$5,500-$9,500 per unit
See all 10 GTA case studies
Client Reviews

What Clients Say About Our Bulk-Unit Cabinets

Named neighbourhoods, real scopes. Ask us for references on any project type.

"Hired for a 24-unit King West bulk-out. Per-unit pricing locked, four crews running parallel, every suite handed over on time with COI in hand."

Jennifer L.

Property Manager, King West

"The mock-up suite settled every argument at the board table. After that it was one floor a week."

Robert C.

Board president, Yorkville

"We used their SKU catalog for a 36-unit lakeshore building. Deliveries were labelled by suite and the punch list was short."

Andrea F.

Developer, Mimico

"They protected the corridors every day and the residents had no complaints. That is rare on a building-wide job."

Gordon W.

Condo manager, Church-Wellesley

"I paid for the white oak upgrade and it was installed the same week as everyone else. No extra delay."

Mei L.

Owner, Yorkville

Got Questions?

Condo Board Bulk-Unit Cabinets FAQs

Can you handle multi-unit condo building bulk cabinet orders?

Yes. Buildings of 20+ suites get locked per-unit pricing of $5,500-$9,500, a standardized SKU catalog, parallel crews and phased suite-by-suite handover with COI in hand, as on our 24-unit King West rollout.

What is a standardized SKU catalog?

A fixed list of box sizes, door styles and finishes designed for your building's layouts. It keeps every suite consistent and means replacement doors and boxes can be ordered by part number years later.

How long does a bulk rollout take?

It depends on suite count and building rules. A 24-unit building typically runs 6-10 weeks of installs after production starts; our Yorkville two-tower job ran over five months.

Do you provide a certificate of insurance?

Yes. We issue a COI within 24 hours and carry $5M liability and WSIB coverage.

Can owners choose upgrades?

Yes. We offer owner upgrade tiers for species or finish, priced per tier and built inside the same schedule.

How do you limit disruption to residents?

Elevator bookings, daily corridor protection and cleanup, work inside permitted hours, and parallel crews so each suite is out of service for days, not weeks.

Do you work with developers on new buildings?

Yes. Developers use our SKU catalog and shop drawings for new builds and conversions.

What warranty covers bulk-unit cabinets?

The same 15-year joinery and lifetime Blum coverage as our residential kitchens, with the warranty transferable to each owner.

Still have a question?

Send photos and rough sizes. A designer replies within 1-2 business days.

Ask a Cabinet Expert

Don't See Your Neighbourhood?

Full GTA from Burlington to Pickering, Aurora to Caledon. Send us your address and room sizes for a free CAD quote.

CAD layout + itemized quote in 1-2 business days

Ready to Plan Your Bulk-Unit Cabinets?

Book a design visit for condo board bulk-unit cabinets anywhere in the GTA. CAD layout and itemized quote within 1-2 business days.

  • 15-year workmanship warranty
  • Written tally before any deposit
  • $5M liability + WSIB
Call Shop Get Free CAD Quote